Post Offer Free
Henan Huineng Road And Bridge Technology Co.ltd.
Henan Huineng Road And Bridge Technology Co.ltd.  

Gold Index: 18353

You are here: home  > Bridge deck repair  > Bridge deck hole repair  > Concrete bridge deck hole rapid repair mortar

Concrete bridge deck hole rapid repair mortar 

Price: 1200.0 USD 
Payment Terms: T/T 
Place of Origin: Henan, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: QM
Production Capacity: 1000 tons / month
Delivery Date: in one week
Initial setting: 25min
Compressive strength: 33.0Mpa/ 2 hours
Expansion: 0.01
color: Grey
Inspection report: MSDS
Means of Transport: Ocean
Packing: Paper plastic composite
Brand Name: HUINENG
Final setting: 30min
Drawing strength: 208Mpa
Speed: 2 hour restore the traffic
Certificate: ISO9001
Uesd: Repair the concrete broken

1,Rapid setting
2,High compressive strength
3,High flexural
4,Cohesive force strong
5,can restore the traffic in 2 hours


Concrete bridge deck hole rapid repair mortar

QM type bridge deck concrete repair material is a kind of one-component special repair material, the material of construction is simple, high strength, good toughness and cohesive force strong, at high speed, high pressure, impact of traffic condition is not broken and not fall off.

Scope of application:

1,Can rapid repair the cement surface crack,hole and so on  ;
2, Bridge expansion joint concrete crushing, hole, crack repair quickly;
3, Expressway, national highway, provincial highway, airport, municipal engineering, tunnel concrete pavement pit, serious cracks, voids, fracture and other severe damage of rapid repairing;

Product advantage:

1, Achieve rapid opening traffic 1-2 hours.
2, High compressive strength: more than 25 mpa. 1 h, 2 h is greater than 35 mpa, 1 d greater than 60 mpa.
3 High flexural strength: 1 h is more than 5 Mpa, 2 h is greater than 7.5 Mpa, 1 d is greater than 10 Mpa.
4 Cohesive force strong, does not result in an empty drum or crack.
5, Product toughness and shock resistance: 5 to 10 times that of ordinary concrete.
6, Coefficient of heat bilges cold shrink, and concrete at the grass-roots level.
7, Swear crack: after solidification and the original concrete crack between swear.
8, Antifreeze salt corrosion resistance: resistance to freezing, sulphate corrosion resistance, non-toxic, non-corrosive.

The construction process:

Traffic control→ identify→lineation→joint-cutting→Chisel except→clean→scour→protection

→Mixing materials→repatching→joint-cutting→maintenance

 

The detected value (28 days)

 

Test items

Unit

Technical Requirements

Test results

Individual conclusions

Setting time

Initial setting

Min

≥20

25

Meet the requirements

Final setting


≤60

30

Compressive strength

2h

Mpa

≥20

33.0

Meet the requirements

1d


≥40

66.1

28d


≥50

90.5

Drawing strength

28d

Mpa

≥2.0

2.8

Meet the requirements

Expansion

28d

/

0.00%-0.1%

0.01%

Meet the requirements

 

packaging and storage

1)Package: Paper plastic composite bag packaging, 25Kg/bag.

2)Storage: Store in a cool, dry place, rainproof and moistureproof.

3)Storage period: 9 months 

Ms. alisa
skype Ms. alisa
saler
Tel: 86-371-65775236
Mobile: 135 2676 8303
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Henan Huineng Road And Bridge Technology Co.ltd. [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Zhengzhou
Province/State: Henan
Country/Region: China (Mainland)

alisa:   skype
alisa:   qq

You May Like: