Post Offer Free
Henan Huineng Road And Bridge Technology Co.ltd.
Henan Huineng Road And Bridge Technology Co.ltd.  

Gold Index: 18353

You are here: home  > Bridge deck repair  > Bridge deck hole repair  > Concrete bridge deck pothole repair

Concrete bridge deck pothole repair 

Price: 1800.0 USD 
Payment Terms: T/T,L/C,WU 
Place of Origin: Henan, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: QM
Production Capacity: 1000 tons / month
Delivery Date: Within 7 working days
Usage: repair bridge deck pothole
Color: Grey
Flexural strength: 5.5Mpa/2 hours
Pulling strength: 2.8Mpa
Certificate: ISO9001:2008
Means of Transport: Ocean
Packing: Paper plastic composite bag...
Brand Name: HUINENG
Speed: 1 hour restore traffic
Setting time: Initial setting:25mins Fin...
Compressive strength: 33Mpa/2 hours
Expansion rate: 0.01%
Inspection report: MSDS

1.Restore traffic in 1h
2.Compressive strength 1d>65Mpa
3.Flexural strength 1d>10Mpa
4.Pulling strength 28d>2.8Mpa
5.Expansion rate 28d: 0.01%

                Concrete bridge deck pothole repair 


concrete pothole in bridge deck:

As for concrete bridge deck pothole repair, we provide fast, professional service utilizing amazing new technology designed to save your time and money! it is a kind of single

component special repair material. mainly repair for bridge deck pothole,achieved 1h open to traffic. 


Technical data of concrete bridge deck pothole repair:

Test items 

Unit

Technical requirement

Test result 

Individual conclusion

Setting time

Initial setting

Min

≥20

  25

Meet requirement

Final setting 

≤60

  35

Compressive strength

2h

Mpa

≥20

  33.0

Meet requirement

1d

≥40

  66.1

28d

≥50

  90.5

Flexural strength

2h


     ≥4

  5.5

Meet requirement

1d

     ≥6

  10.5

28d

     ≥8

  13.5

Pulling strength

28d

Mpa

     ≥2.0

   2.8

Meet requirement

Expansion rate

28d

 /

0.00%-0.1%

   0.01%

Meet requirement

Core advantage of concrete bridge deck pothole repair:

  • 1H open to trafffic:Fast setting.rapid repair bridge deck pothole.

  • Bonding tightly:No break and fall off from normal concrete.

  • High compressive strength,1d≥60Mpa, 28d≥80Mpa,

  • Good toughess: Impact resistance strength is 8-10 times of normal concrete 

  • No drying cracks in new and old adhesion area.

  • Heat expansion and cold contraction is nearly same as original concrete.

  • Color of repaired area is close to original concrete. 

Concrete bridge deck pothole repair way:

Step 1: Joint-cutting

Step 2: Chiseling 

Step 3: Wash and Clean 

Step 4: Mix QM repair material with water 

Step 5: Pour mixed repair material to pothole

Step 6: Open to traffic 


If you need repair concrete bridge deck pothole, pls contact us quickly. Time and Money can be saved for you.



Ms. alisa
skype Ms. alisa
saler
Tel: 86-371-65775236
Mobile: 135 2676 8303
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Henan Huineng Road And Bridge Technology Co.ltd. [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Zhengzhou
Province/State: Henan
Country/Region: China (Mainland)

alisa:   skype
alisa:   qq

You May Like: