Henan Huineng Road And Bridge Technology Co.ltd.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Henan, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
concrete sidewalk repair materials
BCtype concrete pavement patching material is ideal material for a professional to solve concrete pavement
surface disease. Located efficiently cure the road from the skin, sand, freezing and thawing, explicit,
crazing and other diseases. After adding water, stir the material directly applied in disease site. 1h
after patching to open transportation.
Two.Scope of application
Airport runways, highway, road, municipal, tunnels, general concrete floor
Three. Product advantage
1. High bond strength,
2. high compressive strength,
3. antifreeze,
4. salt corrosion resistance,
5. wearable. You can thin patch; not broken and does not fall off at high speed and high
pressure driving condition.
Fourth, Construction process:
Traffic Control → Logo → crossed → kerf → chiseled scour → cleanup cleanup →
protection → spices → Patch → slitting → conservation → relieve traffic control
Five Technical parameters
Test items | Unit | Technical Requirements | Test results | Individual conclusions | |
Setting time | Initial setting | Min | ≥15 | 20 | Meet the requirements |
Final setting | ≤60 | 28 | |||
Compressive strength | 1h | Mpa | ≥20 | 28 | Meet the requirements |
1d | ≥30 | 63 | |||
28d | ≥50 | 95 | |||
Drawing strength | 28d | Mpa | ≥2.0 | 2.8 | Meet the requirements |
Expansion | 28d | / | 0.00%-0.1% | 0.02% | Meet the requirements |
Six Note
1. The cement concrete pavement repair materials for the early-type material, the operating time is usually less than 15 minutes; user needs based on the operating time adjustable material; hardened mortar is strictly prohibited.
2. Add the aggregate must be clean and free of impurities hold, the best control in 20-30% of normal gravel (diameter less than 15 mm graded).
3. Construction of the summer has been good repair area surface should prevent exposure, can be patched plastic film covering the surface area;
4. Winter conservation should pay attention to insulation, hot water can be stirred and stamped with rockwool insulation, the temperature is below 5 ℃, or wind or rain can not be greater than 5 construction.
Seven Packaging and Storage
1. Packaging paper bag,25Kg / bag.
2. Storage store in a cool dry location, use the moisture barrier layer at the bottom, top with a waterproof plastic sheeting to protect myself, to ensure ventilation and avoid direct sunlight.
3. The storage period of six months
Eight: Company Profile
Henan Huineng Road and Bridge Technology Co.,Ltd was established in 2008 as a comprehensive manufacturing and trading company. We have been in road repair material,bridge repair material,high performance concrete expansive agent,grouting material for six years and are specialized in producing all kinds of road repair material,bridge repair material,high performance concrete expansive agent.
We are famous for our superior quality, competitive prices, first-class craftworks, safe package and prompt delivery. Therefore, we can fully satisfy your demands and have a large customer base. Our products sell well in European.