
![]() |
Henan Huineng Road And Bridge Technology Co.ltd.
|
Price: | 1000.0~1800.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU |
Place of Origin: | Henan, China (Mainland) |
![]() |
![]() |
Add to My Favorites | |
HiSupplier Escrow |
One. Product introduction
BC-type concrete repair material is ideal material to solve concrete pavement surface disease. Efficiently cure the road from the skin, sand, freezing and thawing, explicit, crazing and other diseases. After adding water, stir the material directly applied in disease site. 1h open transportation after patching.
Two.Scope of application
Airport runways, highway, road, municipal, tunnels, bridges, general concrete floor.
Three. Product advantage
The 8 big Advantage of the Product:
1. Repair fast, the traffic can be opend in 2-4 hours.
2. Easy operation.
3.High bond strength.
4. High compressive strength.
5. Antifreeze.
6. Salt corrosion resistance.
7.Wear-proof .
8.Small color difference
Fourth. Construction process
Identifying→Cleaning→Washing→Wetting→Cleaning→Adding water→Mixing→Paving→Curing→Joint-cutting
Five.Technical parameters
Test items | Unit | Technical requirement | Test result | Individual conclusion | |
Setting time | Initial setting | Min | ≥15 | 25 | Meet requirement |
Final setting | ≤60 | 35 | |||
Compressive strength | 2h | Mpa | ≥20 | 32 | Meet requirement |
1d | ≥30 | 63 | |||
28d | ≥50 | 95 | |||
Pulling strength | 28d | Mpa | ≥1.0 | 2.8 | Meet requirement |
Expansion rate | 28d | / | 0.0%-0.1% | 0.02% | Meet requirement |
Six. Attention
1. The cement concrete pavement repair materials for the early-type material, the operating time is usually less than 15 minutes; user needs based on the operating time adjustable material; hardened mortar is strictly prohibited.
2. Add the aggregate must be clean and free of impurities hold, the best control in 20-30% of normal gravel (diameter less than 15 mm graded).
3. Construction of the summer has been good repair area surface should prevent exposure, can be patched plastic film covering the surface area;
4. Winter conservation should pay attention to insulation, hot water can be stirred and stamped with rockwool insulation, the temperature is below 5 ℃, or wind or rain can not be greater than 5 construction.
Seven. Packaging and Storage
1. Packaging paper bag, 25Kg / bag.
2. Storage store in a cool dry location, use the moisture barrier layer at the bottom, top with a waterproof plastic sheeting to protect myself, to ensure ventilation and avoid direct sunlight.
3. The storage period of six months
Eight. Our company and factory
Henan Huineng Road and Bridge Technology Co.,Ltd. is using Modern Road Construction Technologies to solve an age old problem. Building a better, stronger and more cost effective road.
Our purpose is to create best solutions for a worldwide road construction industry.